Summary:
This report refers to Task 7.2 – Tools test and validation, which was focused on testing and validating the tools developed in ATTEST from an economic, technical, and environmental perspective.
To this end, several networks and DER integration scenarios were selected from the test cases defined in WP2.
Several Key Performance Indicators (KPIs) were used to compare Business as Usual (BaU) scenario with the ATTEST solution to demonstrate the performance of the tools developed in the project. The KPIs are classified in 5 categories with a different specification for each tool. KPIs are calculated for provided Croatian, Portuguese, the UK, and Spanish distribution networks and Croatian, Portuguese, and the UK transmission network for 2030, 2040, and 2050.
The tools were integrated into the ATTEST platform, where they can be run with real-time data from the networks of Koprivnica and surrounding areas. However, due to technical impediments related to the secure operation of the networks involved in the demonstration, it was not possible to directly control some of the flexible assets through the platform. Therefore, as no flexibility is actually available in the networks in the 2020 scenario, no differences exist between the BaU and the ATTEST scenario for this year.
The results of this report were compiled and used to calculate the project final KPIs that are presented in D7.3.
IIT Project: ATTEST (ATTEST)
Funding entity: Comisión Europea. Horizon 2020 – Cooperation / Energy
Publication date: 20-10-2023
IIT-23-457I